Separator steps:

1. Select the appropriate floor or ground. Installed on a flat, solid concrete or steel foundation, should remain stable and the retracting force uniform coolant magnetic separators feet, beware frame deformation caused due to uneven ground.
2. After the first bottom-fixed beam - magnetic head - vertical and dial - on the beam - excitation coil actuator installation pressure test, then use a crane to install the drive in turn means the end of the beam, the beam, magnetic heads, rotary, vertical magnetizing coils and other components.
3. After the installation is completed before commissioning respond tank leak test trial, with water to rinse all parts of the device, and then turn the power regulator slurry separators to the best.
 