Tuesday, June 23, 2015

Dry drum magnetic separator maintenance

Dry drum magnetic separator maintenance:
1. Wet drum separator should be full-time staff to check and installation.
2. equipment installed in the concrete foundation level, and with the anchor bolts.
3. The installation should pay attention to the main body vertical and horizontal.
4. Press the power configuration of the device power cord and control switches.
5. Check is completed, the empty load test, test the normal production.

No comments:

Post a Comment